We are doing a SPS upgrade of ECC 6.0 EHP 7. We are using SUM 1.0 SP17. I chose the option 'Advanced' with NZDT (Near zero downtime). In pre-processing phase the step RUN_FDCT_TRANSFER is running for more 48 hours. It is actively processing DB query on cluser table RFBLG.
Any advise if I am missing anything here? Is this a kind of bug with SUM? I have no information available online that this is a long running phase. hence I am clueless with this.