I have done it many times and had sometimes a bit struggle with it.
What is the right procedure to realease a SPAU Transport Order? Befor assign it in spau as spau transport? After confirming the modification adjustment?
I think this is the right way:
Transaction spam:
1. Install Support Packages until the message "Call SPAU" comes in client 00
2. Start Spau in client 100 and adjust all objects. Create a new transport order.
3. As soon I have finished with the modifcation adjustment, I realase the tasks of the order (but not the order himself).
4. Then I mark the transport order for subsequent upgrade in spau.
5. Then back in spam I confirm the adjustment.
6. After Support Packages have been installed I confirm the queue.
7. Now I realease the transport order.
Is this the right procedure? Or do I have to release the transport order before confirming the adjustment in SPAM?
Is there a possibility to see in se10 if the order has been correctly assigned?
Thanks and regards