Hello,
we are facing following problem:
After the upgrade from ERP 6.0 EHP 6 to EHP 7, the over night process chains on our BW 7.40 (BI) System (Which is loads data from the ERP System) takes much longer and causing much more system load (CPU, RAM). There are no Errors but the System is at the limit.
Does anybody have the same problems/phenomenon ?
Is there a solution, except of extend the hardware ?
Thanks
Lukas