Dear All,

 

Facing error in ECC 6.0  to ECC6.0 EHP 7 upgrade configuration phase -  DBSL Version mismatch

 

below is the error message showing in SUM tool

ERROR:The new SAP tools in /usr/sap/<SID>/SUM/SUM/abap/exe cannot connect to your database.

 

FYI - SSFS configured already and not using the  ops$mechanism.

 

when i check the R3trans -d  in usr/sap/SID/SUM/abap/exe it shows the below message.

 

 

4 ETW000  [ dev trc,00000]  Library '/usr/sap/SID/SYS/exe/run/dboraslib.so' loaded  
             26  0.031711
4 ETW000  [ dev trc,00000]  function DbSlExpFuns loaded from library /usr/sap/SID/SYS/exe/run/dboraslib.so
4 ETW000                                                                           
             59  0.031770
4 ETW000  [dbcon.c ,00000]  *** ERROR => Version mismatch between executable (742.06)

and DBSL shared library (721.02)

4 ETW000                                                                           
             98  0.031868

2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sa

p/SID/SYS/exe/run') or dbms_type ('ORA')"

 

 

 

i have updated primary instance dboraslib.so to latest patch of 721 in exe/run/ but still getting error in SUM tool,

i cant upgrde my kernel to 742 in primary instance since its old release ECC6 NW700.

 

Please let me know if someone came across the same issue.

 

 

Thanks

 

Shafir


In QAS Transprot has missed

$
0
0

After go Live our company realized that some of most configuration has directly places in PRD server. so the issue have we don't have an updated QAS server, is there any possibilities that we can go back a transport (PRD->QAS)???

 

Any Suggestion !!

Thanks   

Support package level not sufficient. ME21N

$
0
0

Hello,

 

we have installed IDES ECC 6.0 and when trying to create items in transaction ME21N, then I get a short dump, with the following message:

 

"Support package level not sufficient. See note 1600482."

 

In this note, it is stated that "These changes are already included in Business Suite 2011 and in SP26 of the SAP AP 7.00 software component." and as I checked in transaction SPAM we have SP26, AP 7.00.

 

Can you please tell me how to overcome this issue? What exactly should be done? In note 1600482 there are no clear actions mentioned as solution.

 

Thanks

Automatic Swap Item Category 'TAN' To Third Party Item Category 'TAS'

$
0
0

Hi All,

 

As Client business requirement, While sales order creation, If particular line item Material- [ item category type 'TAN' ] is not available on request delivery date at unrestricted stock then system automatically convert to third party item category 'TAS' and create Purchase requisition.

 

If partial qty is available at unrestricted stock then rest of the balance qty change to TAS from TAN

 

Example

  1. Line item 10 --> order quantity 50 no’s and available qty is zero in unrestricted stock then entire 50 qty has to convert to third party order automatically.
  2. Line item 20--> order quantity 30 no’s and available qty is 12 in unrestricted stock then only 18 no’s qty has to convert to third party order by automatically.



I am requesting you to kindly give the suggestion, As per my knowledge I ave checked that there is no option of SAP standard configuration setting, most possible solution is User Exit.



So Please guide me is there any User exit is available or is there any option for standard configuration setting.



Thanks



Regards

Shivakumar Manoharan

 

 

 

Error in MAIN_SWITCH/SUBMOD_SWITCH_KERNEL/KX_SWITCH!

$
0
0

Hi Team,

 

We are upgrading ECC system from EHP5 to EHP 7.

We are in downtime phase, and stuck with kernel switch issue.

 

With below error, i tried to delete/rename the file but its prompting "the action cannot be completed because the file is open in system"

 

Last error code set: Deleting '\\hostname\saploc\PRD\SYS\exe\uc\NTAMD64\slcryptokernel.dll' failed: The process cannot access the file because it is being used by another process. <br/>    

 

========================================

 

 

 

3 ETQ399 Optional list file 'dbclient.lst' found in 'F:\usr\sap\PRD\SUM\abap\exe'.

3 ETQ399 Optional list file 'igsexe.lst' found in 'F:\usr\sap\PRD\SUM\abap\exe'.

3 ETQ399 Optional list file 'sapcrypto.lst' found in 'F:\usr\sap\PRD\SUM\abap\exe'.

1 ETQ295 Starting kernelmove

1 ETQ399 Cleaning up kernel directory 'F:\usr\sap\PRD\SYS\exe\run'.

2 ETQ399 Keeping 'INSTALL' if existant.

2 ETQ399 Keeping 'uc' if existant.

2WETQ399 Protection file 'protect.lst' does not exist - skipped.

2 ETQ399 Keeping files from 'sapuni.lst'

1 ETQ399 Cleaning up kernel directory '\\HOSTNAME\saploc\PRD\SYS\exe\uc\NTAMD64'.

2 ETQ399 Keeping 'INSTALL' if existant.

2 ETQ399 Keeping 'uc' if existant.

2WETQ399 Protection file 'protect.lst' does not exist - skipped.

2 ETQ399 Keeping files from 'sapuni.lst'

1EETQ399 Unable to delete file \\HOSTNAME\saploc\PRD\SYS\exe\uc\NTAMD64\sapcrypto.dll: Deleting '\\SSGSYDPRDCI1\saploc\PRD\SYS\exe\uc\NTAMD64\sapcrypto.dll' failed: The process cannot access the file because it is being used by another process.

 

1EETQ399 Unable to delete file \\HOSTNAME\saploc\PRD\SYS\exe\uc\NTAMD64\slcryptokernel.dll: Deleting '\\HOSTNAME\saploc\PRD\SYS\exe\uc\NTAMD64\slcryptokernel.dll' failed: The process cannot access the file because it is being used by another process.

 

 

1EETQ399 Last error code set is: Deleting '\\HOSTNAME\saploc\PRD\SYS\exe\uc\NTAMD64\slcryptokernel.dll' failed: The process cannot access the file because it is being used by another process.

 

 

1EETQ204 Upgrade phase "KX_SWITCH" aborted with severe errors ("20150510033745")

 

 

Appreicate your quick help.

 

Thankyou


Regards

Nani

SAP Upgrade nZDM process

$
0
0

Hi,

 

We have started the upgrade of BW 7.0 to 7.31 by using nZDM approach to reduce the downtime window.

We have reached to the end of phase Pre-processing where it is showing me the nZDM replication is active and its 95% completed and so I can start the downtime now.

 

As my downtime windows is going to start 3 days from the time of phase it has reached of replication stating 95% completed. Its already 24 Hours passed and when I am checking the status still it is showing 95% and also when I check in CRR tcode in Shadow instance I can't see any table in process there.

 

Is it normal it takes so long or is this is a bug where it shows till 95% only ??

Or I should wait for sometime more for getting it complete.

 

I am bit confuse with this state, Also when I am checking the logs on OS level of SUM the logs of replication is getting updated continuously. Also I am worried if this is something zombie it should not full my file system where the SUM logs are getting generated till the time of downtime window.

 

Can you somebody put some lights on this to clear my doubts please.

 

 

 

Regards,

Anil Bhandary

SAP R3 4.7 upgrade to ECC6 EHP7 in Windows 2003

$
0
0

Dear All,

 

I have a current system running on Windows 2003, Mssql 2000 and R3 4.7. We are going to upgrade our current setup to ECC6 EHP7 with MSSQL2012.

Our new server comes with Windows 2012 R2. We are aware that Mssql 2000 or Mssql 2005 is not supported in Windows 2012 R2. Therefore we are going to get temporary server (with Windows 2003) to upgrade. Below is the plan:

 


1. Prepare a temporary server with same OS level as current setup (Windows 2003).

 

2. Install SAP 4.7, MSSQL 2000 and perform system copy of old server to the temporary server.

 

3. Upgrade MSSQL 2000 to MSSQL 2005.
4. Upgrade SAP 4.7 to ECC6 EHP7

5. Upgrade MSSQL 2012

6. Install ECC 6.0 EHP7 on new server

7. System Copy from temporary server to new server.


Please advice if the upgrade 4.7 to ECC6 EHP7 in Windows 2003 is possible. Also upgrade MSSQL2005 to MSSQL2012 in Windows 2003 is possible.

I have searched in all the relevant site but could not get conclusive answer such as PAM, Notes,etc.

Many thanks for your input.


Cheers,

Kharthi

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

$
0
0

We are performing PI upgrade from 7.0 to 7.4 . During downtime phase, we are observing that offline migration

 

 

Issue: During upgrade execution phase "Run Offline Migration" Following error is coming

 

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

Warning: validation was turned on but an org.xml.sax.ErrorHandler was not

set, which is probably not what is desired.  Parser will use a default

ErrorHandler to print the first 10 errors.  Please call

the 'setErrorHandler' method to fix this.

Error: URI=null Line=2: cvc-elt.1: Cannot find the declaration of element 'migration'.

"JMT_FRAMEWORK_08.ERR" 35 lines, 2310 characters

 

Our OS is AIX 7.1 and Database is Oracle 11g.

 

Kindly let us know if you have any workaround or solution for same.


ERP 6.0 Ehp5,Netweaver 7.30(BW), SCM 7.0

$
0
0

Hi Experts,

 

We have ecc 6.0 ehp5 , Netweaver 7.3 & SCM 7.0 systems with HP-UX as OS and Oracle 11i database. Client want to update all the end users desktops with internet explorer 11 and Microsoft office 365. Please provide me your valuable suggestions for the request.

 

Thanks

Rao

Dump in MD4C tcode TSV_TNEW_PAGE_ALLOC_FAILED

$
0
0

Hi,

 

In MD4C we have given plant order number and after that executed..

 

After some time system giving TSV_TNEW_PAGE_ALLOC_FAILED dump.

 

Please help on this issue

Upgrade of IS-UT to release 606

$
0
0

Hi everyone,

 

When trying to activate Utilities in transaction sfw5:

utilites.PNG

I got following:

utilities2.PNG

System is SAP ERP 6 EHP6, and it is upgraded to latest SPS.

I am not sure how to perform required actions.

In transaction SAINT stack file is required. I am not sure how to generate stack file for this particular case. I have used Maintenance optimizer for generating stack files for SPS upgrade, but I am not sure how to use it now.

How can I generate stack file using Maintenance optimizer for this particular case?

 

 

Best regards,

Zeljko Paic

Gap between preprocessing phase and system downtime

$
0
0

Hi Experts,

 

I have completed preprocessing phase on SCM 7.0 EHP3 upgrade(nZDM) in production system and now there are 5 more days to go for execution phase ( downtime).. since the system is in running status to the users in between and shadow instance has been created now..what should do I have monitor in the system daily before to go for the execution phase

 

I would appreciate your inputs and any relevant documents.

 

Thanks in advance

Error during EHP 7 Upgrade in phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME

$
0
0

Hi,

 

In ECC 6 EHP 7 upgrade, in phase "MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME" we are facing the below issue (we are using SUM tool patch 0 for SUM 1.0 SP13).

Last error code set: RFC error system DER nr 21 function

'SUBST_START_REPORT_IN_BATCH' failed with code 5 key BATCH_SCHEDULING_FAILED:

Number:000

 

Below the content of PSCPFROMCUT.LOG :

 

1 ETQ201 Entering upgrade-phase "MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME" ("20150519212517")

4 ETQ399 Set database connect to shadow.

4 ETQ399 Set environment for shadow connect:

4 ETQ399 Set RFC variables for shadow connect:

4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'

4 ETQ380 computing toolpath for request "TP_SHADOW_CONNECT"

4 ETQ381 request "TP_SHADOW_CONNECT" means "tp needs to connect to shadow system"

4 ETQ382 translates to group "R3UP_TOOL_GROUP_NEW"

4 ETQ399 Requirement for tp maps to 'exe'

4 ETQ383 translates to path "/usr/sap/DER/SUM/abap/exe"

4 ETQ399 Set tool parameters for shadow connect with TPPARAM 'SHADOW.TPP'.

2 ETQ366 Connect variables are set for shadow instance access

4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_db4_schema=R3DERDATA

4 ETQ399   auth_shadow_upgrade=1

1 ETQ206 Executing pre-phase DB specific actions.

1 ETQ200 Executing actual phase 'MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'RSCPFROM_CRR'

2 ETQ399 Arg[1] = 'SAP_CPFROMCRR_UT'

2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.$(SAPSID)'

2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.$(SAPSID)'

2 ETQ399 Arg[4] = '10'

2 ETQ399 Arg[5] = 'Copy selected tables from shadow'

1 ETQ399 Using error summary log 'RSCPFROMUT.ELG'.

1 ETQ399 Expanded phase arguments:

2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.DER'

2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.DER'

4 ETQ265 Starting report "RSCPFROM_CRR" with variant "SAP_CPFROMCRR_UT" in batch

1 ETQ359 RFC Login to: System="DER", AsHost="SAPDEV" Nr="21", GwHost="SAPDEV", GwService="sapgw21"

2 ETQ232 RFC Login succeeded

4 ETQ010 Date & Time: 20150519212525 

1 ETQ233 Calling function module "SUBST_START_REPORT_IN_BATCH" by RFC

2 ETQ373 parameter "IV_ABORT_ON_ERROR" = ""

2 ETQ373 parameter "IV_AUTHCKNAM" = "DDIC"

2 ETQ373 parameter "IV_BATCHHOST" = "SAPDEV"

2 ETQ373 parameter "IV_JOBNAME" = "RSCPFROM_CRR"

2 ETQ373 parameter "IV_REPNAME" = "RSCPFROM_CRR"

2 ETQ373 parameter "IV_SCHEDEVER" = "X"

2 ETQ373 parameter "IV_VARIANTTEXT" = "copy from shadow w/o keys"

2 ETQ373 parameter "IV_VARNAME" = "SAP_CPFROMCRR_UT"

2 ETQ373 parameter "IV_LANGUAGE" = "E"

2 ETQ399 Table TT_REPORTPARAM (#2):

3 ETQ399 "LOGFILE","P","","","RSCPFROM_CRR_UT.DER",""

3 ETQ399 "ACTION","P","","","UPTIME",""

2 ETQ373 parameter "IV_BATCHINSTANCE" = ""

1EETQ235 Call of function module "SUBST_START_REPORT_IN_BATCH" by RFC failed (error-status "5")

2EETQ360 RFC of "SUBST_START_REPORT_IN_BATCH" failed:

2EETQ361 code/exception  : 5

2EETQ362 key             : BATCH_SCHEDULING_FAILED

2EETQ399  Number:000

4 ETQ010 Date & Time: 20150519212526 

1EETQ399 Last error code set is: RFC error system DER nr 21 function 'SUBST_START_REPORT_IN_BATCH' failed with code 5 key BATCH_SCHEDULING_FAILED:  Number:000

1EETQ204 Upgrade phase "RUN_RSCPFROM_CRR_UPTIME" aborted with severe errors ("20150519212526")

 

Please help !

Use of more than 1 SPDD transport??

$
0
0

Hello,

 

how it is possible to use more than one SPDD transport during the upgrade?

 

The SUM-Tool allows only one SPDD transport to select??

 

Gruß

Toni

EHP 7 upgrade pre-requisties

$
0
0

Hi All,

 

We are going to perform EHP7 upgrade from EHP6 in our ECC system. I have done following things.

 

1.stack xml generation.

2. software downloads

3.Latest kernel,R3trans and all latest spam/saint

4. latest SUM

 

I have gone through the guides.

Other pre-requisties should be like.

1. Take full backup of database

2. FS backups

3.Setting heap memory parameters.

 

Kindly let me know , if I am missing anything in the pre-requisties.

 

Regards,

Karthik.R


Automatic Swap Item Category 'TAN' To Third Party Item Category 'TAS'

$
0
0

Hi All,

 

As Client business requirement, While sales order creation, If particular line item Material- [ item category type 'TAN' ] is not available on request delivery date at unrestricted stock then system automatically convert to third party item category 'TAS' and create Purchase requisition.

 

If partial qty is available at unrestricted stock then rest of the balance qty change to TAS from TAN

 

Example

  1. Line item 10 --> order quantity 50 no’s and available qty is zero in unrestricted stock then entire 50 qty has to convert to third party order automatically.
  2. Line item 20--> order quantity 30 no’s and available qty is 12 in unrestricted stock then only 18 no’s qty has to convert to third party order by automatically.



I am requesting you to kindly give the suggestion, As per my knowledge I ave checked that there is no option of SAP standard configuration setting, most possible solution is User Exit.



So Please guide me is there any User exit is available or is there any option for standard configuration setting.



Thanks



Regards

Shivakumar Manoharan

 

 

 

Support package level not sufficient. ME21N

$
0
0

Hello,

 

we have installed IDES ECC 6.0 and when trying to create items in transaction ME21N, then I get a short dump, with the following message:

 

"Support package level not sufficient. See note 1600482."

 

In this note, it is stated that "These changes are already included in Business Suite 2011 and in SP26 of the SAP AP 7.00 software component." and as I checked in transaction SPAM we have SP26, AP 7.00.

 

Can you please tell me how to overcome this issue? What exactly should be done? In note 1600482 there are no clear actions mentioned as solution.

 

Thanks

Erro Atualização status Nf-e ERP x GRC

$
0
0

Temos uma NF-E que está inutilizada corretamente na SEFAZ, e atualizada noGRC.

Mas o status no ERP desta nota continua na engrenagem.

O GRCenvianota dosdados de actualizaçãoparaoERP, mas consta erro no ERP para atualização

Este erroé genérico, não sabemoso quepode ser:

"Novo status de comunicação de sistema "Rejeição de inutilização/cancelam.foi aceita pelo não permitido p/SCS "Enviada ao sistema"

revimosvárias vezes, mas sem sucesso.

 

 

Alguém poderia dar uma luz do desta ocorrencia?

 

Obrigada.

 

Tatiane.

error during sap basis patch sp13 upgrade

$
0
0

Dear Experts,

 

while upgrading the sap basis patch sp13 i am facing the issue like table is not able to activate.

spamerror.png

SUM: MAIN_UPTRANS/STARTSAP_PUPG were negative ! Urgent

$
0
0

MAIN_UPTRANS/STARTSAP_PUPG were negative!

 

 

 

Last error code set: process usr/sap/DEVEBMSG00/exe/sapcontrol exited with 2, see' oracle/SUM/abap/log/SAPup.ECO

 

for details<br/> System Start failed       

Viewing all 1012 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>